Typical Project Timeline

1. PRODUCT DESIGN (2-3 weeks)
Physical dimensions, shape, features, clips
Material selection
Critical features 

2. TOOL DESIGN (1 week)
Number of cavities – volume & unit cost driven
Tool size to suit machines
Special features – ie hot nozzle

3. PRODUCT MANUFACTURE (3-9 weeks)
Production and development of Tool

4. TOOL TESTING AND PRODUCT TRIALLING (1 week)
Mouldability assessed
Tool size to suit machines
Shape and surface finish
Fit to other parts
Physical performance (strength, brittleness, etc)
Customer approval

5. PRODUCTION (2-3 weeks)
Typical lead time